FAQ
Answers to questions about services and products at Hari Module
Answers to questions about services and products at Hari Module
Construction progress depends on weather factors, especially outdoor work
It takes a lot of time to mobilize construction workers at the construction site
Difficulty: Especially steep, mountainous areas, flooded areas
Impact on underground geological structure
Leaving waste after construction
Regional infrastructure is degraded due to high traffic volume – > increased CO2 levels
Causing air and noise pollution to neighboring areas
The safety level for workers is not guaranteed by the prefabricated house model
Electricity and water are mandatory factors that must be provided for the construction process
Easy to construct small, meticulous details, curved details
Still carrying traditional thinking, not paying attention to health and environmental issues
No need
– Concrete house: easier, customers can drill or punch holes to hang additional shelves if necessary.
– Prefabricated house: more difficult, because it affects the wall structure. If customers need to install shelves
4,300,000 VND/ m2
Including: foundation, masonry, painting, finishing, tiling, roof structure and roof covering
It is a steel frame house designed, processed and assembled together in modules at the factory
Complete connection at the construction site
Not affected
High because it is easy to disassemble
Convenient for expansion (or contraction), or moving to another location
High: Suitable for many types of terrain, especially steep, mountainous areas and flooded areas
No impact on underground geological structures
No construction waste left in surrounding areas
Reduce traffic flow -> reduce CO2 emissions and do not impact regional infrastructure
Minimize air pollution and noise during construction
Provide safer installation conditions for workers and surrounding areas
Save electricity and water during construction
It is more difficult to construct small, meticulous details and curved details
Lightweight and durable: plastic floor, load-bearing wood, steel frame,…
Safe for consumer health: EPS foam insulation, wall panels (virgin plastic), no wall paint,…
Environmentally friendly, reusable
Requires protection against material corrosion
Requires protection against material corrosion
5,000,000 VND/ m2
Includes: steel structure frame, roof sheet, wall covering, EPS foam insulation, plastic – wood flooring